Excavation and Backfilling of Soil - Work Sequence and

Excavation and backfilling of soil is a very important part of construction process, and care must be taken while excavation in safety perspective. Different soil layers may be encountered while excavation, dewatering may be needed sometimes. These points must be kept in mind to take necessary action during excavation and backfilling.

Get a Quote

Excavation works for laying drainage pipes along Shanghai

Apr 20, 2021 · The company Shanghai Construction Group (SCG) has used, through our importer ATE, a TF 850 double-drum cutter head within excavation works for laying underground drainage pipes along Shanghai subway. Given the sensitivity of the area, the company has specifically requested an attachment to grant the selective breaking of asphalt and concrete, with no …

Get a Quote

Underground Drainage: Basic Principles

Ensuring the pipe is square to the fitting, push the pipe fully into the socket, and then withdraw 10mm (this allows for any expansion or ground movement). The joint is now complete. Laying Drainage Pipes. Underground Drainage Pipes should be laid in a trench that is 300mm wider than the pipe itself (i.e. 410mm for 110mm pipes).

Get a Quote

How to prepare for drainage construction - FACE

Oct 19, 2018 · Part of preparing for the drainage works can include planning and scheduling testing and survey activities for when the works are complete, before construction of the superstructure begins. While the temptation is to get on with developing the site above ground as quickly as possible, taking the time to test the system and record it 'as-built

Get a Quote

(PDF) THE CONSTRUCTION METHOD FOR SURFACE DRAINAGE

• The Construction Method of Drainage. THE VARIOUS TYPE OF DRAINAGE TECHNOLOGIES CORRUGATED DRAIN PIPES • A corrugated pipe is a tube with a series of parallel ridges and grooves on its surface. This pipe can be manufactured of steel or plastic such as high-density polyethylene (HDPE) or PVC. It can be coated or lined.

Get a Quote

IS 12288 (1987): Code of Practice for Use and Laying of

the laying of pipes. 3. SITE PREPARATION 3.1 Preliminary work required to be done before laying of pipelines includes pegging out, clearing and disposal of all shrubs, grasses, large and small bushes, trees, hedges, fences, gates, portions of old masonry, boulders, and debris from the route.

Get a Quote

Construction and Service Dispatch Software by FOUNDATION®

The FOUNDATION® Service Dispatch Module gives field service managers the power to coordinate dispatches, contracts, billing, inventory and more. See where the construction industry is heading. Download the FREE 2021 Construction Business Report Now!

Get a Quote

Excavation works for laying drainage pipes along Shanghai

Method Statement For Installation of PVC uPVC Drainage

Get a Quote

Guideline Road Drainage - ROADEX Network

1.2 Importance of drainage 5 2. Legal Background 7 2.1 Section 76 of the Roads Act, 1993 7 2.2 Other procedures for obtaining consent to lay pipes under private land 12 3. Current Practice 16 3.1 Open Drains 16 3.2 French Drains 16 3.3 Piped Drainage 17 3.4 Culverts 22 3.5 Plant and Equipment 22 3.6 Conclusion 22 4. Design of Road Drainage

Get a Quote

Method Statement for Drainage Works – Civil Engineering

Useful Notes on Method Statement for Drainage Works – Civil Engineering 1. Scope: The intention of this "document is to define the activities involved in the drainage works. 2. Relevant Process/Specification: ADVERTISEMENTS: Contract specifications 3. Tools/Equipment Required: Theodolite, leveling staff, plate' compactors, compressor, jack hammer, pump, measuring tape, …

Get a Quote

Method Statement for Drainage Installation

• A trench will be excavated along the line of the new pipe. Ensure level integrity by using the pipe laser or a manual level. • Ensure the maximum depth is 1m and the width is 600mm. • Ensure a base of sand is in place prior to the installation of the pipes. • Enter into the excavation only whilst connecting the pipes.

Get a Quote

Work Procedure of Excavation at Construction Site - The

Working Procedure of Excavation. The first and primary step involved in the excavation is to find out the extent of soil and Clearing of construction site is of unwanted bushes, weeds and plants. Setting out or ground tracing is the process of laying down the excavation lines and centre lines etc. on the ground before the excavation is started.

Get a Quote

Steps to Building a Crawlspace Foundation | eHow

Excavating the Foundation Technically, you could dig with shovels, but nearly all foundations today benefit from front-end loader and backhoe excavation. After staking out the foundation perimeter, the excavation contractor will dig the main foundation hole.

Get a Quote

CHAPTER 2 EARTHWORK 2.1 SCOPE: 2.2 GENERAL

along the edge of the right-of-way in accessible locations for the property OWNER'S use. 2. Limits of the pipe-laying operation shall be confined to the right-of-way. The width of clearing shall be held to a minimum and shall be no more than specified on the plans, without written consent of …

Get a Quote

#80 - Excavating Hill Side For Foundation - YouTube

Excavation Procedure for Foundation - Setting out, Safety

Get a Quote

Pipe Laying Construction Video - YouTube

Mar 15, 2017 · Aerial Pro Image, LLC specializes in drone-based aerial photography and video services for commercial and residential clients spanning a wide range of busine

Get a Quote

Pipeline Construction Risk Assessment including North of

The individual risks of personnel on the construction vessel are estimated for all potential emergencies and provided below, where all risks are lower than the tolerability criteria of 10-3 per person per year: Pipe lay vessel (anchored) 1.9 x 10-5 per person per year. DP Pipe lay vessel 6.9 x 10-5 per person per year.

Get a Quote

Guideline Road Drainage - ROADEX Network

1.2 Importance of drainage 5 2. Legal Background 7 2.1 Section 76 of the Roads Act, 1993 7 2.2 Other procedures for obtaining consent to lay pipes under private land 12 3. Current Practice 16 3.1 Open Drains 16 3.2 French Drains 16 3.3 Piped Drainage 17 3.4 Culverts 22 3.5 Plant and Equipment 22 3.6 Conclusion 22 4. Design of Road Drainage

Get a Quote

Excavation and Backfilling of Soil - Work Sequence and

Excavation and backfilling of soil is a very important part of construction process, and care must be taken while excavation in safety perspective. Different soil layers may be encountered while excavation, dewatering may be needed sometimes. These points must be kept in mind to take necessary action during excavation and backfilling.